top of page

Provide a general description of the items below and introduce the services you offer. Click on the text box to edit the content.

Sewer Bore_edited.jpg

HDD BORING

Horizontal directional drilling (HDD) is a trenchless construction method used to install pipes underground without disturbing the ground surface. The process takes place 100% under the ground offering a more aesthetic result. In the past, used mainly for going under roads, railroads, creeks, rivers, and ponds, the process has been adopted in all aspects.  

bucket truck.jpg

AERIAL CONSTRUCTION 

When the ground is uneven or rocky, aerial installation may be particularly useful, especially when poles or towers are already in place. Pole sharing can greatly reduce installation costs and deployment times, making aerial installation much less costly than underground construction, in general.

Aerial fibers are typically much faster and cheaper to deploy than buried networks.

splicing pic.jpg

FIBER OPTIC'S

Fiberoptic splicing is the process of joining two fiberoptic cables together creating a continuous path for data transmission. Splicing takes place everywhere on a project including at the FDH, Pedestals, and the home. We offer a turn key product when it comes to splicing by offering all these applications.  

  • Other services 

Fiberoptic Service Planning, Engineering, and Consulting

Aerial Construction (Powerspace Certified)

Drop Construction

Open Trenching

Plowing

Mainline Splicing

Testing

Drop Splicing

Drawings/As-Builts

Locating

Mapping Services

 

bottom of page